Skip to main content

B-09 Modelling of water use

Aspect B-09 Modelling of water use

Description
Is B7 relevant at a product level? How should the operational water use be modelled?
Related
study objective
☒ stand-alone LCA ☒ comparative assertion
Related
study phase
☒
goal and scope definition
☐
inventory analysis (LCI)
☐
impact assessment (LCIA)
☐
interpretation
☐
reporting
Relevant for
new buildings

existing buildings

construction products

screening LCA

simplified LCA

complete LCA

Provisions
In general, the user has to decide whether this aspect is important for the product; the consideration of operational water use in Module B7 is necessary only for complete LCA studies.

Rules from
EN 15804 6.3.4.4.3 B6–B7 use stage information modules related to the operation of the building

Guidance
The regulated water use of building-integrated technical systems is determined by the design and use of the building. Attention should be paid to avoid double counting between the product and the building scale.

Lifecycle stage: B (all modules), Lifecycle stage: B7, Related study objective: comparative assertion, Related study objective: stand-alone LCA, Related study phase: Goal and scope definition, Study type: Complete LCA, Study type: Screening LCA, Study type: Simplified LCA