Skip to main content

G-15 (Buildings) / G-14 (Products) Transport of goods in LCA studies

Aspect G-15 (Buildings) / G-14 (Products) Transport of goods in LCA studies

Description
With globalized supply chains, logistic processes occur throughout the life cycle of every product. The most important ones are transport processes, where several possibilities exist for the activity of carrying goods (e.g. by truck, ship or airplane) for the various life cycle stages, e.g. raw materials supply, manufacturing, on-site implementation, end of life. The environmental impacts connected with transport processes depend on several factors, e.g. the transport distance, the load factor or the empty return. How should the transport of goods be considered?
Related study
objective
☒ stand-alone LCA ☒ comparative assertion
Related study
phase
☒
goal and scope definition
☐
inventory analysis (LCI)
☐
impact assessment (LCIA)
☐
interpretation
☐
reporting
Relevant for
new buildings

existing buildings

construction products

screening LCA

simplified LCA

complete LCA

Provisions
Generally speaking, in all LCA studies of a product or a building, transportation processes should be included for every life cycle stage: raw materials supply, manufacturing, transportation to the site, use, and end of life.
The EeBGuide provisions are adapted depending on the study types and the corresponding life cycle stages. For screening and simplified LCA studies, transport to the building site and transport to end-of-life facilities are optional, owing to their potentially minor relevance, whereas they should be included for complete LCA. If they are included, the results should be documented separately.
The provisions for a specific life cycle stage (e.g. Module A4) supersede the general provision provided here. The practitioner should refer to the provisions for the corresponding aspects: ‘Transport of raw materials to the manufacturer’, ‘Transport of products to the construction site – screening and simplified LCA’, ‘Transport of products to the construction site – complete LCA’, ‘Transport of wastes to landfill, incineration and recycling facilities’.
Other kinds of transport of goods not directly related to a building product may be taken into account for building LCA studies if they are relevant for the goal and scope of the study. If they are included, the practitioner should refer to the provisions for the corresponding aspects: ‘Transport of construction machinery to the building site – screening and simplified LCA’, ‘Transport of construction machinery to the building site – complete LCA’.

Rules from
EN 15978 7.4.3.2 Boundary of the transport to and from site (Module A4)
7.4.3.3 Boundary of the construction installation process (Module A5)
7.4.4 Boundaries of the use stage (Modules B1–B7)
7.4.5 Boundary of the end-of-life stage (Modules C1–C4)
7.4.6 Boundary for the benefits and loads beyond the system boundary (Module D)

=> Transport of goods, wastes, construction equipment and construction materials should be included in the different life cycle stages

EN 15804 6.3.4.2 Product stage
6.3.4.3 Construction stage
7.3.2.1 A4, Transport to the building site
7.3.2.2 A5, Installation in the building
7.3.4 End-of-life

=> Transport of goods, wastes, construction equipment and construction materials should be included in the different life cycle stages


Guidance
Any life cycle stages (i.e. Modules A1–A3, A4, A5, B and C) should include the related transport processes. The practitioner should be aware that even if a life cycle stage is labelled e.g. A3 ‘Manufacturing’, internal transport of goods can occur. Thus the transport-related impacts theoretically occur for each life cycle stage.

For any gate-to-grave information module, additional information to support the generation of LCA data at the building level can be provided by means of a scenario. Module A4 includes only transport from the factory to the construction site. Earlier transport journeys are included in Modules A1 and A2. For example, in an EPD for a steel cladding panel, the transport of iron ore to the steelworks is included, with the extraction of iron ore, and the production of steel sheet via the blast furnace and basic oxygen furnace, in Module A1. The transport of the steel sheet to the panel manufacturer is included in Module A2, panel manufacture is included in Module A3, and transport from the panel manufacturer to the construction site in Module A4.

Transport is generally a significant impact only for materials with very low manufacturing impact, such as aggregates and timber. Also, transport by water has much lower impact than transport by road. Guidance mentioned in the cut-off rules aspect should be adopted for the inclusion of transport processes in the life cycle of a building or a product.

Default values for average distances, truck types and load factors should reflect the actual transport. For average LCA data, the use of average values may be sufficiently accurate. Average values can be found in various literature sources e.g. in some transport reports available for each country, or in the documentation of transport LCA datasets from individual databases (e.g. ecoinvent, ELCD, GaBi). Further guidance adapted to the study type and to the life cycle stage is given in the other aspects.

G-16 (Buildings) / G-15 (Products) Accounting for carbon storage/carbon sequestration

Aspect G-16 (Buildings) / G-15 (Products) Accounting for carbon storage/carbon sequestration

Description
Some products (e.g. wooden products) take up atmospheric carbon dioxide while producing biomass. Concrete- and lime-based products can also take up atmospheric carbon dioxide through recarbonization during the use phase. By using these materials or products, this fixed CO2 is stored during the service life of the product. It is then released during combustion processes, or in landfill during full or partial decay of the biomass, as either CO2 or methane, which itself may be captured to produce CO2. Owing to the storage of carbon of biogenic origin in some products during the use of these materials, the CO2 stored is not released in today’s ecosphere but at some future date. Usually, 100-year assessment periods for the fate of greenhouse gases are taken into account in LCA studies (use of the indicator global warming potential, GWP100), but, depending on the case, this period can be insufficient to counteract the storage period. In this case, how should the biogenic carbon be taken into account? Should this temporary storage effect be accounted for? Also, the matter of sequestration of carbon in soils and organic matter due to land-use changes is frequently discussed. How should this aspect be treated?
Related study
objective
☒ stand-alone LCA ☒ comparative assertion
Related study
phase
☒
goal and scope definition
☐
inventory analysis (LCI)
☐
impact assessment (LCIA)
☐
interpretation
☐
reporting
Relevant for
new buildings

existing buildings

construction products

screening LCA

simplified LCA

complete LCA

Provisions
As a conservative approach, the storage or sequestration of biogenic carbon as an additional benefit should not be accounted for, as this is a temporary effect. All greenhouse-gas-related environmental impacts should be quantified solely with the use of IPCC’s GWP-100 impact category. This means that the uptake of carbon dioxide into biomass is considered in the inputs to biomass production, and the emissions of biogenic carbon (as carbon dioxide or methane) are considered in the outputs.

Rules from
ILCD Provisions 7.4.3.7 Future processes and elementary flows
Citation from provisions 7.4.3.7:
“VII) SHALL – Inventory temporary carbon storage and delayed GHG emissions: only if temporary carbon storage in bio-based goods is considered […] delayed emission as CO2 or CH4 shall be modelled analogously to delayed emissions of fossil carbon dioxide and other greenhouse gases”
Additional citation from the ILCD Handbook:
The uptake of “carbon dioxide” by plants shall be inventoried under “resources from air”. This applies to all photosynthetic organisms.

The ILCD Handbook recommends that for better methodological clarity and flexibility, as well as easier communication, the release of carbon dioxide and methane be additionally differentiated between fossil and biological sources. Both the uptake of carbon dioxide from the atmosphere and the release of both fossil and biogenic carbon dioxide are assigned characterization factors for the impact assessment. The full provision for inventory of temporary carbon storage and delayed GHG emissions can be found in the ILCD Handbook.


Guidance
This aspect is under intense discussion within various organizations. Different perceptions exist, and various documents propose different solutions to this question. For example, some documents define ‘discounts’ for the temporal storage of carbon in products. Others suggest, for example, reduction factors to be applied to GWP results for a temporal sequestration of carbon in soil and organic matter due to land-use change.

In order to be flexible concerning future development and consensus-building on this aspect, it is helpful to track carbon with a distinction made between biogenic and fossil sources. For example, in the background LCI databases, it is likely that elementary flows will be found such as:

Resources: ‘carbon dioxide (resource), in air’
Air emissions: ‘carbon dioxide (fossil), in air’ and ‘carbon dioxide (biogenic), in air’

This is also valid for methane and carbon monoxide.

Further information can be found in the following sources:

  • ISO working group on carbon footprint;
  • PAS 2050.
  • Standard in preparation in CEN TC 175 prEN 16449: ‘Wood and wood-based products – Calculation of sequestration of atmospheric carbon dioxide’ (status: under approval)

The treatment of biomass at the end of life is covered in the aspects of Module C and this should be considered alongside this guidance.

G-17 Differences in background data system boundaries

Aspect G-17 Differences in background data system boundaries

Description
Currently, practitioners have to deal with various different data sources, such as public or commercial LCI databases, EPDs, literature, etc. All these data have been calculated by applying different rules, and so special attention has to be paid to assessing the consistency of these different sources. An increasing number of EPDs for building products are freely available in the market. These EPDs have been produced in the framework of different programmes, applying different product category rules (PCR) and system boundaries, and so they should not be directly compared nor combined. Recently, the EN 15804 standard has been approved, and in the coming years will foster harmonization between the various EPD programmes. In the meantime, how can the practitioner deal with differing background data?
Related study
objective
☒ stand-alone LCA ☒ comparative assertion
Related study
phase
☒
goal and scope definition
☐
inventory analysis (LCI)
☐
impact assessment (LCIA)
☐
interpretation
☐
reporting
Relevant for
new buildings

existing buildings

not for products

screening LCA

simplified LCA

complete LCA

Provisions
An increasing number of EPDs for building products are available. These EPDs apply different system boundaries, e.g. cradle to gate (product stage), cradle to grave (the whole life cycle) and cradle to gate with options (Modules A1–A3 plus other, additional modules). If the EPD is EN 15804 compliant, then the information is declared separately for each module, facilitating its use in building LCA studies. EPDs that comply with EN 15804 should also provide additional technical information to ensure proper understanding of a product’s function in a building by supporting scenario development at the building level.
For all these reasons, EN 15804-compliant EPDs can be accepted as a data source for building LCA as well as generic data (if the goal is to do e.g. a screening LCA). These EPD data may also be seen as an appropriate data source for background data as well as the usual generic data.

Rules from
EN 15804 5.2 Types of EPD with respect to life cycle stages covered
EN 15978 10 Selection of environmental data and other information – Use of Environmental Product Declaration(s)

Guidance
Different EPDs and other background data may be used for a building LCA study; however, special care has to be taken when using these different data sources for building LCA. In this sense, it is key to have a good understanding of whether the LCA-based information found in an EPD represents the product stage only (e.g. cradle to gate), the product stage and selected further life cycle stages (cradle to gate with options EPD) or the complete life cycle of the product (cradle to grave).

Additional technical information included in the product’s EPD (such as service life, transportation distance, loss of the product on-site, etc.) would also be very useful for the assessment at the building level. In any case, consistency of the LCA modelling should be ensured so that the system boundary of the EPDs is homogeneous.

Whenever possible, the use of EPDs that comply with EN 15804 should prevail, if they are more relevant for use in a national context than any other background data. In addition, the practitioner should check that the LCA-based information found in such EPDs is compatible with the scope of the study.

In addition to such EN 15804-compliant EPDs, the practitioner most likely has to rely on various background data sources, such as public or commercial databases. It is strongly recommended that practitioners use as much data as possible from a consistent source (e.g. one public national database), which ideally should be methodologically consistent with the appropriate EPDs (e.g. from one national EPD programme with the same methodological assumptions).

If EPD data are to be used as background data, it is important to ensure that they can be reused for further EPD – e.g. a raw material EPD used for a product EPD. In this context, it is important to have a data-compatible exchange format to ease the use of EPD (the information to be reused is likely to be only the cumulative impact results, as no LCI is provided in most EPD programmes).

G- 18 Allocation case for cement-based materials

Aspect G-18 Allocation case for cement-based materials

Description
Increasing numbers of building products are being made of secondary raw materials (SRM), or of generated waste that can be recycled throughout their life cycle. On the one hand, recycling eliminates the need to use virgin raw materials. On the other hand, the new commercial interest in waste can be seen as a shift in their status from waste to co-product. Several industries use a considerable amount of waste produced in other economic sectors (e.g. the cement industry uses blast furnace slag from the steel industry, and fly ash from electricity production). Depending on the ‘end of waste’ status of each product, allocation rules may be needed to separate the burdens between the producer of the waste and the user. The environmental impact of very common building materials can thus vary greatly, depending on the allocation rules chosen. How can this critical allocation case be treated, e.g. for the use of waste in the cement and concrete materials?
Related
study objective
☒ stand-alone LCA ☒ comparative assertion
Related
study phase
☒
goal and scope definition
☐
inventory analysis (LCI)
☐
impact assessment (LCIA)
☐
interpretation
☐
reporting
Relevant for
new buildings

existing buildings

construction products

screening LCA

simplified LCA

complete LCA

Provisions
The allocation rules should comply with EN 15804 and EN 15978. In addition, the rules of national EPD programmes should be followed (if available).

Rules from
EN 15804 6.4.3.2. Co-product allocation
ILCD 14.4.1.2 Market value of waste/end-of-life product is above zero, i.e. it is a co-product
14.4.1.3 Market value of waste/end-of-life product is negative

Guidance
Generally speaking, the allocation rules should be defined in every national context, together with the relevant sectors that use and produce the waste or co-product. A manufacturer of building products using e.g. wastes from another economic sector needs to share burdens with the first user. The allocation actually depends on the ‘end-of-waste’ status: that is, whether the waste is treated as waste (treatment allocated to the first user, and reported in Module C) or whether it is treated as a new product (when end-of-waste status is reached, the waste is transformed into a product, and the processing is allocated to the new product life cycle).

One option is to look at the market value of the waste, as proposed in the ILCD Handbook (see reference above). For example, waste from the steel industry (blast furnace slag) or from electricity production (e.g. fly ash) may be used to produce cement with a low clinker content.

Current practice in Europe shows varying rules for the allocation of cement SRM. They are treated as co-products in the UK (and in the subsequent EPDs), whereas they are considered as waste in France and in Germany (and in the subsequent EPDs of these two countries). The new European Waste Directive (see below) is currently not being applied in a consistent way.

The practitioner, when using LCA data that may be sensitive to the allocation of by-products according to the EU Directive (considered either as waste or as co-product), should specify the allocation rules, especially for complete LCA. Sensitivity analysis should be conducted if the allocation of by-products has a significant role in the LCA results.

A third guidance point concerns the use of background data. Depending on the type of background data, they may not comply with the allocation rules. As the practitioner does not have an influence on the background data, the best recommendation is to be transparent, e.g. in the LCA methodological report.

Further information and references on this issue:

G-18 (Buildings) / G-16 (Products) Allocation

Aspect G-18 (Buildings) / G-16 (Products) Allocation

Description
Normally, LCA studies should focus only on a single product at a time. However, systems under assessment often produce more than one product. The same problem arises when different waste flows are treated collectively in the same process (e.g. incineration). In these situations, the allocation problem arises: that is, how to allocate the environmental loads of those shared processes to the products delivered. In the building sector, owing to its long supply chain and influence, virtually all allocation cases can be found, from raw materials supply and manufacture (e.g. co-production processes) to the end of life (e.g. energy recovery during the incineration of building products) but also during the use phase (e.g. allocation of renewable energy produced in the building). The allocation rules may have a significant influence on the LCA results, and so this is a key methodological aspect. How should allocation be tackled in the case of buildings and building products?
Related study
objective
☒ stand-alone LCA ☒ comparative assertion
Related study
phase
☒
goal and scope definition
☒
inventory analysis (LCI)
☐
impact assessment (LCIA)
☐
interpretation
☐
reporting
Relevant for
new buildings

existing buildings

construction products

screening LCA

simplified LCA

complete LCA

Provisions
According to ISO 14040/14044, the ILCD Handbook and the EN 15804/EN 15978 standards, when dealing with systems involving multiple products and recycling processes, allocation should be avoided as far as possible; when unavoidable, allocation should be considered carefully, and justified. Allocation should be handled as mentioned in EN 15804/EN 15978 and the ILCD Handbook. Other aspects provide guidance for the most frequently found allocation problems occurring for energy-efficient buildings or products.

Rules from
EN 15804 6.4.3 Allocation of input flows and output emissions
6.4.3.1 General
6.4.3.2 Co-product allocation
6.4.3.3 Allocation procedure of reuse, recycling and recovery
ILCD Provisions: 7.9.2 Avoiding allocation by subdivision or virtual subdivision

  • “I) SHALL – Analyse whether allocation can theoretically be avoided by substitution”
  • II) SHALL – Aim at avoiding allocation by subdivision or virtual subdivision”

Provisions: 7.9.3 Solving multifunctionality by allocation

  • “I) SHALL – Share inventory between co-functions by allocation”
  • II) SHALL – Differentiate multifunctional processes and multifunctional products”
  • III) SHALL – Two-step procedure for multifunctional processes”
    • III.a) First step and criterion “determining physical causality”
    • III.b) First step and criterion “determining physical causality”
    • III.c) Checklist for “determining physical causality” criteria”
  • IV) SHOULD – Second step and criterion “market price”
  • V) SHOULD – Two-step procedure for multifunctional products”
  • VI) SHALL – Attributional modelling of reuse, recycling, recovery”
  • VII) SHALL – System-wide consistent application of allocation”
  • VIII) SHALL – 100% rules”

Guidance
The following main allocation methods are frequently used in LCA practice:

  • allocation based on market price (e.g. a gold mine where other precious metals such as silver are also extracted as co-products);
  • allocation based on physical mass/volume/energy content;
  • allocation based on exergy (e.g. a refinery with a multitude of products with high energy value).

The mass allocation may be preferred, as it is less sensitive to market price changes. However, there are no globally uniform rules. For complete LCA, an in-depth analysis has to be made of this issue, and the allocation procedure applied has to be justified. This is also the case for a study with a special focus on a certain aspect (e.g. recycling).

The ILCD Handbook (see rules above) provides a comprehensive procedure for doing the allocation in a consistent way. The practitioner should make sure that allocation rules are applied in a consistent way throughout the assessed system.

For building LCA applications, this means that the data used for the study should have been modelled using the same allocation rules. For example, if the blast furnace slag is considered as a co-product when it leaves the system boundary of a construction steel product, then the cement should use the slag as a co-product linked to the fabrication of slag in the steel industry. The same rules apply if the slag is not allocated as co-products; then the cement should use it as a waste. If the allocation rules differ between the steel and the cement then the system is not balanced, which does not comply with the ILCD rules. Further information on this relevant example for the construction sector can be found in the corresponding aspect.

The practitioner should also check that the sum of inventories allocated to all the co-products is equal to the inventory of the system before allocation was done [ILCD 2011a].

In addition, the LCA practitioner should prove that the chosen allocation rule does not change the overall conclusions and results of the study. This can be applied by scenario analysis (see the corresponding aspect), if allocation is used in foreground systems. Scenario analyses are most likely not feasible for assessing the impacts of the allocation rules used within background datasets.

G-19 Allocation case: production of renewable energy on-site

Aspect G-19 Allocation case: production of renewable energy on-site

Description
The production of on-site renewable energy can occur at different times of the day, month and year, and may or may not meet on-site needs. Renewable energy may be consumed on site, or may be exported to the electricity grid or to a heating network, for example, according to the instantaneous needs of the building. How should this on-site energy production be accounted for, and can the loads and benefits be allocated between the electricity grid and the building?
Related study
objective
☒ stand-alone LCA ☒ comparative assertion
Related study
phase
☒
goal and scope definition
☒
inventory analysis (LCI)
☐
impact assessment (LCIA)
☐
interpretation
☐
reporting
Relevant for
new buildings

existing buildings

not for products

screening LCA

simplified LCA

complete LCA

Provisions
The amount of renewable energy produced with the help of on-site systems to supply operational energy for the use of the building should be accounted for as part of the LCI of the building being assessed, attributing the on-site production to the building life cycle. The allocation of exported energy follows the case studies of EN 15978, Annex B.

Rules from
EN 15978 7.4.4.7 Boundary for the operational energy use (Module B6)
Annex B (informative) Exported energy – Case studies
ILCD Provisions: 7.9.3 Solving multifunctionality by allocation
Provisions: 7.9.2 Avoiding allocation by subdivision or virtual subdivision

Guidance
The method for the calculation of on-site renewable energy production should be consistent with [EN 15643-1]. Renewable energy produced by systems located on the building site and supplying energy demand for building uses should be considered (e.g. thermal solar panels, photovoltaic panels, wind turbines…). Other thermal energy gain from on-site renewable energy sources (solar gains through windows or solar walls) can also be accounted for complete LCA. Calculation method should be reported and justified.

Boundary for energy production at operational stage should be consistent with boundary for product (A1–A3) and construction processes (A4–A5) modules:

  • If the energy produced by the on-site system is accounted for in Module B6, the production system should be accounted for in Modules A1–A5.
  • The accounting of renewable primary energy for the operational stage should be consistent with the accounting of renewable primary energy for materials, the amount of renewable primary energy is the measured output energy, not the amount of energy potentially available.

For on-site systems exporting energy outside the building boundary see the aspect described in Module B6: “Operational energy calculation – Allocation of energy production for on-site systems connected to grid”.

G-20 (Buildings) / G-17 (Products) Allocation case: reuse, recycling and recovery

Aspect G-20 (Buildings) / G-17 (Products) Allocation case: reuse, recycling and recovery

Description
When the lifespan of a product ends, it can be reused, recycled, or used for recovery in another product system. These recovery operations entail a benefit for the system that yielded them. How to allocate these benefits to the system under study, or to other product systems that will recover these materials, is still an open topic within the LCA community. What allocation method should be used for the reuse, recycling and recovery of construction waste?
Related study
objective
☒ stand-alone LCA ☒ comparative assertion
Related study
phase
☒
goal and scope definition
☒
inventory analysis (LCI)
☐
impact assessment (LCIA)
☐
interpretation
☐
reporting
Relevant for
new buildings

existing buildings

construction products

screening LCA

simplified LCA

complete LCA

Provisions
According to EN 15804, components for reuse and materials for recycling and energy recovery are considered as potential resources for future use. The reuse, recycling and recovery operations result in benefits, but also entail environmental loads. In the case of EPDs (products), the net environmental impacts (positive or negative) should be quantified separately in a so-called ‘Module D’. Calculation of Module D impacts should be based on average existing technology, current practice, and the net impacts of the recovery processes in comparison with the impacts of producing the substituted good (energy or primary raw material). EN 15804 provides guidelines for allocation with regard to reuse, recycling and recovery.
EN 15978 refers to EN 15804 to deal with scenarios for reuse, recovery and recycling potentials outside the system boundary of the building under assessment, in order to describe the processes that lead to future substitution of resources.

Rules from
EN 15804 6.4.3 Allocation of input flows and output emissions
6.4.3.1 General
6.4.3.2 Co-product allocation
6.4.3.3 Allocation procedure of reuse, recycling and recovery
ILCD 7.8 Modelling the system
Provisions: 7.9.2 Avoiding allocation by subdivision or virtual subdivision
Provisions: 7.9.3 Solving multifunctionality by allocation
“VI) SHALL – Attributional modelling of reuse, recycling, recovery
VI.a) Follow general rules for multifunctionality, observing specific aspects
VI.a.i) Dealing with waste and end-of-life products of negative market value that generate secondary goods
VI.a.ii) True joint process to be identified
VI.b) Provisions:
VI.b.i) Negative market value
VI.b.i) Market value equal or above zero”
14 ANNEX C: Modelling reuse, recycling, and energy recovery

Guidance
Allocation can have significant effects on the results of an LCA study. Therefore the allocation method should be documented as transparently as possible, with reference, if possible, to the European standards or the ILCD Handbook. The aspect ‘Allocation example for wooden products’ provides further guidance. A recent article presenting the concept of Module D was presented at the 2012 Symposium on LCA and Construction. For deeper insight into this subject, the interested practitioner may refer to this article: [Leroy 2012].

G-21 Background databases in LCA studies

Aspect G-21 Background databases in LCA studies

Description
According to the ILCD Handbook, the background system comprises those processes that are not under the direct control or decisive influence of the producer of the good. For attributional modelling these are typically processes for both the upstream and downstream parts of the entire life cycle of a product. For comparative assertions, the use of consistent background data is crucial. Generally, a product or a building process tree always includes intermediate flows (according to ISO 14044), such as energy, electricity, transport and raw materials. These processes may be modelled using background data available in generic databases.
In this context, which database should be used for background data in an LCA study? Which database should be chosen, or which rules should be defined for the use of a database for comparative assertions?
Related study
objective
☒ stand-alone LCA ☒ comparative assertion
Related study
phase
☐
goal and scope definition
☒
inventory analysis (LCI)
☐
impact assessment (LCIA)
☐
interpretation
☐
reporting
Relevant for
new buildings

existing buildings

construction products

screening LCA

simplified LCA

complete LCA

Provisions
All data used in an LCA study should be modelled with a uniform methodology. This can typically be achieved by using a public or commercially available background database and modelling the foreground system in a consistent way.
For comparative studies (in simplified or complete LCA studies), it is highly recommended, or even essential, to use datasets that are consistent, e.g. consistent within one database. If this is not possible (e.g. because of data gaps or incomplete documentation), any other data should comply with the methodological rules of the database used for the study.

Rules from
ILCD 9 Life cycle interpretation
Provisions: 9.3.4 Consistency check

Guidance
In general, the LCA practitioner should use consistent data from a single source. For European research projects, the use of European databases such as ecoinvent, GaBi, ELCD or ESUCO may be appropriate. The mixing of background data from different databases should be avoided for comparative assertions. This is especially true if data from different databases are not used similarly in the compared models, or if the methodological rules and the quality guidelines do not match between the mixed data.

However, in practice the mixing of background data can occur. For example:

  • if one background dataset (e.g. raw material production, or energy supply) is more representative for the context of the study than the one in the main database being used;
  • for EPD databases where no mandatory background database is provided. In this case the background data provider should ensure that the use of their data does not lead to bias in the comparative assertions (as the practitioner cannot influence the background data).

In general, the use of different background data is not a problem; it is more the adaptation of data in terms of methodology and cut-off rules that can be a problem (for the LCA study). Some databases providing unit process data can easily be adapted to the goal and scope of the LCA study, and to the other background data that cannot be modified, but some databases cannot be adapted in this way.

If the lack of specific datasets in a background database leads practitioners to combine data from different literature sources, they need to decide whether it is more important to use a consistent but roughly estimated dataset (and possibly data that are not relevant for the context of the study), or to use a dataset that may be better in terms of representativeness, but which is methodologically inconsistent with the alternative data.

In this context, one possible solution is to use data quality indicators for assessing both the representativeness of the data and the consistency of the methodology, compared with the goal and scope of the study: for example, is the dataset compliant with the national context in terms of representativeness?

G-22 (Buildings) / G-23 (Products) Data quality

Aspect G-22 (Buildings) / G-23 (Products) Data quality

Description
Generally speaking, the data quality in LCA refers to the relevance of generic or specific LCA data in accordance with the goal and scope of the study. Depending on the background data sources (literature, industry data), and the boundaries and context of the study (e.g. for which purposes or countries are the data being used?), the data quality can be very different within one study. Although data may be of good quality for context Y, this will not necessarily be the case for context Z, as the requirements (e.g. geographical representativeness) may be different. The practitioner should keep in mind that data quality is always a relative concept. In order to point out this aspect as transparently as possible, the quality of the data has to be justified in the context of its use. How should the quality of the LCA data be described, and can the practitioner ensure that data of a specific quality are needed and produced?
Related study
objective
☒ stand-alone LCA ☒ comparative assertion
Related study
phase
☐
Goal and scope definition
☒
Inventory analysis (LCI)
☐
Impact assessment (LCIA)
☐
Interpretation
☐
Reporting
Relevant for
New buildings

Existing buildings

Building products

Screening LCA

Simplified LCA

Complete LCA

Provisions
The data quality of LCA studies should at least meet the requirements of EN 15978 and EN 15804, and the documentation, nomenclature, method and review should be implemented accordingly.

Rules from
EN 15978
10.3 Data quality
Different criteria are given in EN 15978, e.g. technological, geographical and temporal coverage (the data should be not older than 10 years). The data should be based on a one-year average (if relevant); check the plausibility and the significance of the data in the final result.

EN 15804
6.3.7 Data quality requirements

ILCD Handbook
6.8 Representativeness and appropriateness of LCI data provisions
6.8.2 Technological representativeness
6.8.3 Geographical representativeness
6.8.4 Time-related representativeness

Annex A: Data quality concept and approach
12.1 Introduction and overview
In the ILCD Handbook, two approaches are defined – 1) data quality in a stricter sense; and 2) the data quality documentation and review:
1) ILCD overall data quality indicators include: technological, geographical, time-related representativeness, completeness, precision/uncertainty, methodological appropriateness and consistency.
2) Data quality documentation aspects cover: documentation, review, nomenclature (e.g. same list of elementary flows)
12.2 Data quality aspects
The ILCD Handbook defines ‘accuracy’ as a term covering all the related data quality aspects, such as:
“Representativeness (technological, geographical, time-related)
Completeness
Methodological appropriateness and consistency”
The ILCD Handbook also provides rules for not mixing the data quality aspects (falling under the term ‘accuracy’) with the other concept of ‘precision’ (or ‘uncertainty’). A graphical illustration (see Figure 11) illustrates this point.


Guidance
In current practice it is usually not possible to choose datasets for quality reasons, but for availability in the construction sector. The practitioner should keep in mind that data quality is crucial for the LCA study. The most appropriate data should be chosen (in terms of representativeness and consistency) as far as possible. Documentation of the used datasets and the quality level is needed as far as possible.
The ILCD Handbook provides some recommendations on data quality, depending on the relative significance of the data in the final results. A graphical illustration (see Figure 12) illustrates this point.