B-16 Refurbishment for screening, simplified and complete LCA

Aspect B-16 Refurbishment for screening, simplified and complete LCA

Description
Refurbishment activities refer to the change of major elements or change of use in a building. Do we need to take refurbishment into account in a building LCA?
Related
study objective
☒ stand-alone LCA ☒ comparative assertion
Related
study phase
☒
goal and scope definition
☐
inventory analysis (LCI)
☐
impact assessment (LCIA)
☐
interpretation
☐
reporting
Relevant for
new buildings

existing buildings

construction products

screening LCA

simplified LCA

complete LCA

Provisions
Refer to provisions in the aspect ‘Distinction between Modules B2, B3, B4 and B5’.

Rules from
EN 15978
  • 7.4.4.1 General
  • 7.4.4.6 Boundary for refurbishment (Module B5)
  • 8.3 Time related characteristics
  • 8.6.4 Scenarios for refurbishment
EN 15804
  • 6.3.4.4.2 B1–B5 Use stage information modules related to the building fabric
  • 7.3.3.1 B1–B5 Use stage related to the building fabric

Guidance
Refer to guidance in the aspect ‘Distinction between Modules B2, B3, B4 and B5’. For example, it is recommended that a refurbishment scenario be developed in the case of a significant reference study period (>100 years); as modification of the building use is expected over such a period of time. A refurbishment scenario could also be developed if the reference study period is higher than the reference service life of load-bearing components and structural elements.

7.7 Module B6 – Operational energy use.

B-20 Operational energy demand for existing buildings – Boundaries and scenarios

Aspect B-20 Operational energy demand for existing buildings – Boundaries and scenarios

Description
Several parameters can influence the results of the energy demand at the operational stage of buildings. Among others, the selection of uses (i.e. building-related or non-building-related uses) has a major significance on the energy demand. European standards (EN 15804/EN 15978) recommend that priority be given to taking building-related uses into account; however, it is obvious that non-building-related appliances significantly influence the energy needs of building-related uses (e.g. the thermal gain of appliances decreases the level of heating demand). Moreover, the global gain obtained by technology mixing building energy uses and non-building-related uses (e.g. appliances such as dishwashers and washing machines using domestic hot water produced by solar thermal panels) can be taken into account only if all operational energy uses are also considered in the assessment. The following section aims at providing guidance for screening, simplified and complete LCA of existing buildings.
Related
study objective
☒ stand-alone LCA ☒ comparative assertion
Related
study phase
☒
goal and scope definition
☐
inventory analysis (LCI)
☐
impact assessment (LCIA)
☐
interpretation
☐
reporting
Relevant for
new buildings

existing buildings

construction products

screening LCA

simplified LCA

complete LCA

Provisions
For existing buildings, measured historical data consumption should be used, if available and applicable. Building-related uses and non-building-related uses may be taken into account according to the goal and the scope of the study.

Rules from
EN 15978
  • 7.4.4.7 Boundaries for operational energy use
  • 8.6.5 Scenarios for operational energy use – Module B6

Guidance
For existing buildings, if measured historical data consumption are available and applicable (i.e. the objective and the scope of the study are consistent with available data, and future changes in the existing building will not impact on the energy uses), they should be used to calculate the energy demand.

Note: the level of detail of energy measurement should allow its use for LCA assessment (i.e. the breakdown of the operational energy demand should be available for each energy carrier). When measured data are available for each energy carrier, building-related and non-building-related uses should be accounted for, as energy monitoring usually does not permit uses to be differentiated. This applies to screening, simplified and complete LCA. For the calculation of energy demand of building-related uses, methods and tools developed by EPA-NR projects may be used.

B-22 Operational energy demand for existing buildings – Consideration of user behaviour

Aspect B-22 Operational energy demand for existing buildings – Consideration of user behaviour

Description
Several parameters influence the results of the energy calculation demand at the operational stage of buildings. Among others, user behaviour may have a major significance on the energy needs. The following section aims at providing guidance for screening, simplified and complete LCA of existing buildings, and the possibility of taking user behaviour into account regarding the goal and the scope of the study.
Related
study objective
☒ stand-alone LCA ☒ comparative assertion
Related
study phase
☒
goal and scope definition
☐
inventory analysis (LCI)
☐
impact assessment (LCIA)
☐
interpretation
☐
reporting
Relevant for
new buildings

existing buildings

construction products

screening LCA

simplified LCA

complete LCA

Provisions
For existing buildings, if measured consumption data are available and applicable for the LCA analysis, user behaviour should be taken into account. Otherwise, the same guidance as for new buildings should be applied.

Rules from
EN 15978
  • 8.6.5 Scenarios for operational energy use – Module B6

Guidance
For stand-alone LCA of existing buildings, if measured historical consumption data are available and applicable (i.e. the objective and the scope of the study are consistent with available data, and future changes in the existing building will not impact on the energy uses), they should be used to calculate the energy demand.

Otherwise, scenarios should reflect statistical or conventional user behaviour. Scenarios reflecting specific user behaviour may be used, but sensitivity analysis should be performed in order to provide evidence of the significance of this deviation. For comparative study of refurbishment alternatives for existing buildings, four different types of operation should be considered:

  • rehabilitation;
  • reference rehabilitation;
  • complete demolition and new construction;
  • maintenance of an existing building (maintain performances during a given period).

A rehabilitation operation consists of a deconstruction operation (removal of products) and a reconstruction operation (adding new products to replace discarded ones). Reference rehabilitation is a generic rehabilitation that implies the use of standard construction materials, designs and processes.

If historical data and/or energy monitoring and reflecting user behaviour (e.g. number of users, occupancy scenario etc.) are available, and if they are applicable (i.e. alternatives for refurbishment do not consider a change of use or other major modification of building systems or occupancy), then scenarios derived from such data should be used to calculate the energy demand for each alternative.

Otherwise, scenarios should reflect statistical or conventional user behaviour. The same scenario should be used for each alternative.

B-23 Operational energy calculation – Allocation of energy production for on-site systems connected to grid”

Aspect B-23 Operational energy calculation – Allocation of energy production for on-site systems connected to grid

Description
Current new buildings may not only be energy-efficient, but can also produce energy on site in multiple ways. The energy produced on site may not only be consumed inside the building, but can also be exported. When energy is produced on site by grid-connected systems (photovoltaic, wind turbines, boiler connected to heating grid etc.), how is this calculated? How are the impacts allocated for both product aspects (e.g. PV cells) and operational energy production?
Related
study objective
☒ stand-alone LCA ☒ comparative assertion
Related
study phase
☒
goal and scope definition
☐
inventory analysis (LCI)
☐
impact assessment (LCIA)
☐
interpretation
☐
reporting
Relevant for
new buildings

existing buildings

construction products

screening LCA

simplified LCA

complete LCA

Provisions
The principles for the calculation of exported, imported and on-site energy production should be consistent with the provisions of EN 15978 (see especially reference cases, annex B).

  • Additional provisions for grid-connected systems: the boundaries (i.e. energy uses included) for the calculation of energy demand and exported energy should be homogeneous.
  • The calculation of exported energy and energy consumed on site should consider simultaneity between the consumption and the production.

The method for allocating environmental impact for product aspects and operational aspects should be consistent with the guidance in EN 15978.


Rules from
EN 15978
  • 7.4.4.7 Boundary of the operational energy use (Module B6)
  • 8.6.5 Scenarios for operational energy use (Module B6)
  • Annex B (informative) Exported energy – Case studies
ILCD
  • 6.8.4 Time-related representativeness

Guidance
The methods for energy calculation should be consistent with the reference cases proposed in annex B of EN 15978. Supplementary recommendations are proposed for on-site energy-producing systems that are connected to the grid (case 3 of EN 15978), as follows.

Boundaries for the calculation
The boundaries chosen for calculation of the energy demand should be consistent with those for calculation of the exported energy: if only building-related uses are included, the amount of energy that does not supply the uses considered should be considered as exported energy. Then two situations may be considered:

  1. Including only building-related uses in the scope of the assessment: other non-building-related uses are not accounted. The exported energy will be calculated without considering the energy demand for non-building-related uses, because these are considered to be beyond the system boundary.
  2. Including both building-related uses and non-building-related uses in the scope of the assessment: the two uses are taken into account for the calculation of exported, imported and on-site consumed energy.

Timescale for the energy calculation

For simplified and complete LCA, an hourly scale should be used in order to take into account simultaneity between energy demand and the on-site energy production.

The annual exported energy, imported energy and on-site energy consumption for the considered energy carrier i may be calculated as follows:

where:

  • Energy production i,h is the amount of energy produced by building on-site systems at hour h for energy carrier i.
  • Energy demand i,h is the amount of energy needed for the considered building energy use at hour h for energy carrier i.

Allocation of environmental data

Rules should be consistent with EN 15978 for both product and operational aspects.

For imported energy (Module B6) and exported energy (Module D) more representative environmental data should be used. For example, for electricity, hourly environmental data should be used in preference to monthly or annual average data. See the corresponding aspect ‘Dynamic LCA data for assessing the impact of electricity consumption’.

B-24 Dynamic LCA data for assessing the impact of electricity consumption

Aspect B-24 Dynamic LCA data for assessing the impact of electricity consumption

Description
Energy sources for electricity production may vary significantly according to the season (winter or summer months), the day (weekdays, weekends) and the time within a day. Environmental impacts are strongly influenced by the decision to use annual energy data (i.e. average LCA data) or energy data based on a shorter period (monthly, daily or hourly).
Related
study objective
☒ stand-alone LCA ☒ comparative assertion
Related
study phase
☐
goal and scope definition
☒
inventory analysis (LCI)
☐
impact assessment (LCIA)
☐
interpretation
☐
reporting
Relevant for
new buildings

existing buildings

construction products

screening LCA

simplified LCA

complete LCA

Provisions
Annual average datasets for electricity production should be used in the baseline scenario. Deviating data can be analysed in additional scenarios with transparent documentation and a sensitivity analysis.

Rules from
EN 15978 Not mentioned

Guidance
Dynamic LCA data can be produced by using the hourly data provided by electricity suppliers in each national context. For example, in France, RTE provides hourly data, broken down by source: fossil, hydropower or nuclear energy. Based on these proportions, and LCI/LCIA data corresponding to each energy source, dynamic LCA data can be calculated. (Note: the LCI/LCIA data statically aggregate elementary flows.)

Such dynamic LCA data can also be linked to models to predict the environmental impacts in a dynamic way (although very few LCA tools for buildings currently provide such assessment). More detailed information on this aspect can be found e.g. in a French PhD thesis by G. Herfray [Herfray 2011] or in [LoRe-LCA 2011].

B- 25 Assessment of operational water use in screening LCA

Aspect B-25 Assessment of operational water use in screening LCA

Description
The operational water use assessment includes water used during the operation of the building, together with their associated environmental impacts and aspects, including the production of drinking water and the wastewater treatments. Moreover, a link between domestic hot water and energy use should be considered.
Related
study objective
☒ stand-alone LCA ☒ comparative assertion
Related
study phase
☒
goal and scope definition
☐
inventory analysis (LCI)
☐
impact assessment (LCIA)
☐
interpretation
☐
reporting
Relevant for
new buildings

existing buildings

construction products

screening LCA

simplified LCA

complete LCA

Provisions
The assessment of the water consumption during use phase should be included into the LCA studies in order to be consistent within the overall assessment methodology (use of a “net fresh water” indicator for different life cycle phases). Moreover, usually, the water consumption during use phase is the most important, compared to the other phases of the life cycle.

It should be assessed using statistical data for screening (see guidance). The upstream and downstream processes linked to the operational water use should be modeled using generic LCA data.


Rules from
EN 15978 7.4.4.8 Boundary of the operational water use (Module B7)

EN 15978 states that the boundary of the operational water use should include water used during the normal operation of the building together with associated environmental impacts due to its treatment (before and after use). This includes drinking water, water for sanitation, domestic hot water, irrigation, water for heating, cooling, ventilation and humidification and other specific water use (e.g. fountains, swimming pools, saunas). Water consumption of not building-related equipment (e.g. dishwashers, washing machines) could be included within the assessment. This issue should be reported separately.

EN 15804 7.3.3.3 B6, use of energy and B7, use of water

Guidance
In order to calculate the water consumption for screening LCA, a methodology based on the statistical data on water consumption at building scale may be used (e.g. in France the average water consumption is about 50 m³/person/year for 2.3 person/dwelling [INSEE, 2006], i.e. 115 m³/dwelling/year). To the volume of consumed water, environmental impacts linked to the production/adduction, respectively wastewater treatment should be associated.

For the screening or simplified LCA only the most representative technologies should be considered by using generic LCA data available in background LCI databases (e.g. ELCD, GaBi or Ecoinvent).

Additional guidance:

Some of the labeling schemes (e.g. DGNB) also use a water indicator which is based on average water consumption of the sanitary system, rainwater and grey water use. Such an indicator may be of help to calculate operational water use for simplified LCI (module B7).

Any comparative assertion should be supported by a sensitivity analysis of different parameters and hypothesis considered during the assessment, especially on the user behaviour. The baseline scenario should be developed by using default values for all the parameters. The default values should be defined based on statistics on the most common values of the moment. Therefore regular update is necessary (as the different equipment characteristics evolve relatively fast).

B-26 Assessment of operational water use in simplified LCA

Aspect B-26 Assessment of operational water use in simplified LCA

Description
The operational water use assessment includes water used during the operation of the building, together with the associated environmental impacts and aspects, including the production of drinking water and wastewater treatment. A link between domestic hot water and energy use should also be considered.
Related
study objective
☒ stand-alone LCA ☒ comparative assertion
Related
study phase
☒
goal and scope definition
☐
inventory analysis (LCI)
☐
impact assessment (LCIA)
☐
interpretation
☐
reporting
Relevant for
new buildings

existing buildings

construction products

screening LCA

simplified LCA

complete LCA

Provisions
Assessment of the water consumption during the use phase should be included in the LCA studies in order to be consistent within the overall assessment methodology (the use of a ‘net fresh water’ indicator for the various life cycle phases). Water consumption during the use phase is usually the most important, compared with the other phases of the life cycle.

Operational water use may be assessed using a top-down approach for simplified LCA (see guidance). The upstream and downstream processes linked to the operational water use may be modelled using generic LCA data.


Rules from
EN 15978 7.4.4.8 Boundary of the operational water use (Module B7)

EN 15978 states that the boundary of operational water use should include water used during the normal operation of the building together with the associated environmental impacts due to its treatment (before and after use). This includes drinking water, water for sanitation, domestic hot water, irrigation, water for heating, cooling, ventilation and humidification, and other specific water uses (e.g. fountains, swimming pools and saunas). Water consumption of non-building-related equipment (e.g. dishwashers, washing machines) could be included within the assessment. This issue should be reported separately.

EN 15804 7.3.3.3 B6, use of energy and B7, use of water

Guidance
In order to calculate the water consumption for simplified LCA, a methodology based on a top-down approach could be followed. It consists in estimating the total consumption by taking into account the economies that can be achieved by using some water saving devices (e.g. dual-flush toilet systems) compared with the average water consumption (e.g. 50 m3/year/person, i.e. 115 m3/dwelling/year) or the extra consumption due to some specific systems (e.g. fountains, swimming pools, saunas).

In addition to the volume of water consumed, the environmental impacts linked to the production, respectively wastewater treatment should also be considered.

For screening and simplified LCA only the most representative technologies should be considered by using generic LCA data available in background LCI databases (e.g. ELCD, GaBi or Ecoinvent).

Additional guidance

Some of the labelling schemes (e.g. DGNB) also use a water indicator that is based on the average water consumption of the sanitary system, rainwater and greywater use. Such an indicator may be of help in calculating operational water use for simplified LCI (Module B7).

Any comparative assertion should be supported by a sensitivity analysis of the various parameters and hypotheses considered during the assessment, especially regarding user behaviour. The baseline scenario should be developed by using default values for all the parameters, defined according to statistics on the most common current values. Regular updating is therefore necessary (as the various equipment characteristics evolve relatively quickly).