Skip to main content

Tag: Study type: Screening LCA

A-04 Transport of products to the construction site – screening and simplified LCA

Aspect A-04 Transport of products to the construction site – screening and simplified LCA

Description
This aspect is related to the transport of building products from the manufacturer’s production plant (or from regional storage) to the construction site. In practice, the assessment of transportation impact depends on the number of manufacturers or the number of regional storage providing a given building product. Such detailed information may be impossible to obtain without close cooperation with the building industry.

Should the transport of products to construction site be included? What could the transportation distance be for each building product? Should losses be allowed for?

Study
objective
☒ stand-alone LCA ☒ comparative assertion
Study
phase
☒
goal and scope definition
☐
inventory analysis (LCI)
☐
impact assessment (LCIA)
☐
interpretation
☐
reporting
Relevant for
new buildings

existing buildings

building products

screening LCA

simplified LCA

complete LCA

Provisions
For screening and simplified LCA, transport to the construction site is optional, because of both potentially missing data and minor relevance at the scale of full building LCAs.

If data are available, transport of products to the construction site may be included in a screening or simplified LCA unless they fall under the cut-off rules. The practitioner should use average transport distances and load factors. Rules should follow the recommendations of EN 15804. This includes the impacts of the transport and the impacts of any transport-related losses of material and its disposal (i.e. the impact of manufacturing material that is wasted as a result of transport, and the impact of disposing of the waste). Losses should be documented, where they occur.


Rules from:
EN 15978:
7.4.3.2 Boundary of the Transport to and from site (Module A4)

EN 15804:
6.2.3 A4-A5, Construction process stage, information modules


Guidance
Modelling of the life cycle stage ‘Transport to the site’ should be iterative, and linked to corresponding cut-off rules defined e.g. in EN 15804/EN 15978.

1) Specific guidance for building LCA studies
For building LCA, transport may be not significant in terms of environmental impact, allowing proxy data to be used. As a default transport distance, average transport distances of 300 km can be assumed for all building products, based on previous work [Nemry 2008]; [Lasvaux 2010]. However, most building products, particularly bulk products such as aggregates or ready-mixed concrete, are likely to travel shorter distances. For example, Eurostat freight transport statistics show that, for almost all member states, more than 50% (by mass) of ‘Other non-metallic mineral products’ travel less than 50 km per trip.

2) Specific guidance for product LCA studies
Previous studies have shown that for cradle-to-grave product LCA transport represents up to 15% of the usual life cycle impact indicators in median values [Lasvaux 2010]. The highest share is for the photochemical ozone potential (POCP), this indicator being more linked to air emissions of lorries than the other ones. Other studies have shown for ‘cradle-to-gate with options data’ (including only transportation to the building site and the construction installation process related to the product) that transport is of relevance, as well as the ancillary products, compare with minor aspects, such as cutting waste or the building process [Kellenberger 2009].

Other studies, e.g. from the UK, have estimated that carbon emissions from freight transport of building products represent at least 5% of the embodied carbon from manufacture. For building LCA (accounting for replacement of building products during the use stage and the end of life), it does not represent more than 5% of the non-renewable primary energy, owing to the higher share of the use phase in building LCAs, based on a French case study [Lasvaux 2010].

A-06 Construction installation process impacts for screening LCA

Aspect A-06 Construction installation process impacts for screening LCA

Description
Construction site impacts are driven mainly by the groundworks (fuel consumption), the transport of products, water and energy consumption (e.g. electricity), and the capital goods (such as crane, bungalow etc.), but also by the transport of construction workers. Under specific goal and scope, it might be interesting for a construction company or a building designer to assess the impacts of Module A5 by means of a default approach, without looking in detail at the different aspects, such as land preparation, water, energy and capital goods.
Study
objective
☒ stand-alone LCA ☒ comparative assertion
Study
phase
☒
goal and scope definition
☐
inventory analysis (LCI)
☐
impact assessment (LCIA)
☐
interpretation
☐
reporting
Relevant for
new buildings

existing buildings

building products

screening LCA

simplified LCA

complete LCA

Provisions
The assessment of construction site impacts may be taken into account in screening LCA by means of a default approach using global default values for Module A5. The intended use of this methodology is to get an overview of the share of impact of Module A5 when considering the full building LCA. If the results are sensitive to Module A5, the practitioner should refer to a more detailed assessment.

Rules from:
EN 15978:
7.4.3 Boundaries of the construction process stage
8.5 Scenarios for the construction process stage (Modules A4–A5)

Guidance
During the design of a building, it may be difficult to assess the information for land preparation, water and energy consumption, owing to the lack of data. However, information on the quantities of building products are information available upstream of a building project from the construction companies. One possibility is then to assess the construction site impacts from the building product impacts, for which the level of detail is comparatively higher. Such a rough estimation may be sufficient for some screening LCA studies of buildings. It is not necessary to define default values at the level of each impact source for Module A5, which considerably reduces the level of complexity in the first step of a building LCA study.

The link between this information needs default values to be provided based on statistical studies for each building type or construction system. Figure 14 represents a theoretical example, for one environmental indicator and for one building type and construction system, of the share of impact between the building products and the four aspects of the construction site taken as examples in this guidance (energy, water, transport of workers, and capital goods).

Breakdown of impacts for a given indicator for one building type

Figure 16: Breakdown of impacts for a given indicator for one building type

The calculation steps required to derive the example results in Figure 14 might be as follows:

1) Calculate the impacts related to the building products (Iproduct).

2) Determine a ratio (default value) Ri, expressed as a percentage, for each aspect i of the construction site (energy, water, transport of freight, and capital goods). These default values can be derived from statistical studies of meter readings of representative construction sites, as well as for the building product impacts.

It is then possible to assess the impact of aspect i of the construction site by means of the global impact of the building products and the ratio (default value): Ii = Iproducts × Ri.

Such a methodology may be followed by the LCA practitioner, and adapted according to the goal and scope of the study.

To obtain representative ratios (default values), the LCA practitioner or LCA tool developer would need to work closely with or contact the construction companies to make such default values available.

A-07 Land preparation and earthwork during the construction process – screening and simplified LCA

Aspect A-07 Land preparation and earthwork during the construction process – screening and simplified LCA

Description
This aspect relates to the impact of site preparation, including the fuel consumption of, for example skid-steer loaders or bulldozers during the groundworks and landscaping. Under the specific goal and scope, this aspect might be interesting for, say, a construction company that needs to identify the hotspots of its construction site. Should the land preparation and earthwork during the construction process be considered in the context of a screening or simplified LCA?
Study
objective
☒ stand-alone LCA ☒ comparative assertion
Study
phase
☒
goal and scope definition
☐
inventory analysis (LCI)
☐
impact assessment (LCIA)
☐
interpretation
☐
reporting
Relevant for
new buildings

existing buildings

building products

screening LCA

simplified LCA

complete LCA

Provisions
The land preparation and earthwork may be included in screening and simplified LCA if they are relevant to the goal and scope of the study (e.g. a construction company might have more interest than a building designer in this aspect).

Rules from:
EN 15978:
7.4.3 Boundaries of the construction process stage
8.5 Scenarios for the construction process stage (Modules A4–A5)

According to the rules from EN 15978, the system boundary for the construction process shall include the groundworks and landscaping.


Guidance
The practitioner should use default values (e.g. ratios or generic data) for screening and simplified LCA, and also refer to cut-off rules. Ratios can be defined with stakeholders. This aspect can be neglected for most construction projects, as it is of minor relevance.

A-09 Product storage on site before installation – screening and simplified LCA

Aspect A-09 Product storage on site before installation – screening and simplified LCA

Description
Storage of products on arrival at site before installation includes such aspects as maintaining specific temperature or humidity in a storage space on site, and protection from weather, vandalism, theft, etc. Under the specific goal and scope this aspect might be interesting for, say, a construction company that needs to identify the hotspots of its construction site. Should the storage of products be considered in the context of a screening or simplified LCA?
Study
objective
☒ stand-alone LCA ☒ comparative assertion
Study
phase
☒
goal and scope definition
☐
inventory analysis (LCI)
☐
impact assessment (LCIA)
☐
interpretation
☐
reporting
Relevant for
new buildings

existing buildings

building products

screening LCA

simplified LCA

complete LCA

Provisions
Product storage on site before installation may be included in screening and simplified LCA if it is relevant for the goal and scope of the study (e.g. a construction company might have more interest than a building designer in this aspect).

If there are impacts from product storage (e.g. maintaining specific temperature or humidity conditions in a storage space on site) then this may be included in Module A5 next to the infrastructures required for the product storage (e.g. protection from weather, vandalism, theft), but these can be evaluated for significance using the cut-off rules.

Any wastage because of poor product storage should be accounted for in Module A5 (manufacture, transport and disposal of wasted material).


Rules from:
EN 15978: 8.5 Scenarios for the construction process stage (Modules A4–A5)

Guidance
The practitioner should use default values (ratios) for simplified LCA. Such data can be defined with stakeholders. This aspect can be neglected for most construction projects, as it is of minor relevance.

A-11 Transport of construction workers – screening and simplified LCA

Aspect A-11 Transport of construction workers – screening and simplified LCA

Description
This aspect concerns the transportation of construction workers from home to work and to the construction site. Under specific goal and scope, this aspect might be interesting for, say, a construction company that needs to identify the hotspots of its construction site.
Related
study objective
☒ stand-alone LCA ☒ comparative assertion
Related
study phase
☒
goal and scope definition
☐
inventory analysis (LCI)
☐
impact assessment (LCIA)
☐
interpretation
☐
reporting
Relevant for
new buildings

existing buildings

building products

screening LCA

simplified LCA

complete LCA

Provisions
The transport of construction workers may be included in screening and simplified LCA if it is relevant for the goal and scope of the study (e.g. a construction company might have more interest than a building designer in this aspect). Transportation of workers to construction site may be included for screening and simplified LCA if it is in the focus of the study. Refer to cut-off rules, and use default values (such as ratios).

Rules from
EN 15978
  • No specific rule is defined (8.5 Scenarios for the construction process stage (Modules A4–A5))

Guidance
The practitioner should use default values (generic data, ratios) for simplified LCA. Such data can be defined with stakeholders.

This aspect may be neglected for most building LCA studies, because it may fall outside the goal and scope. However, specific building stakeholders, such as construction companies, may have a special interest and thus will take it into account.

If taken into account, this aspect is likely to fall under cut-off rules for most construction projects. Such a statement should be supported through detailed studies of the construction stage. It will be revised if more evidence is available.

A-13 Transport of construction machinery to the building site – screening and simplified LCA

Aspect A-13 Transport of construction machinery to the building site – screening and simplified LCA

Description
This aspect concerns the transportation of machinery necessary for the construction of a building from the storage place to the construction site. Under specific goal and scope, this aspect might be interesting, e.g. for a construction company that needs to identify the hotspots of its construction site.
Related
study objective
☒ stand-alone LCA ☒ comparative assertion
Related
study phase
☒
goal and scope definition
☐
inventory analysis (LCI)
☐
impact assessment (LCIA)
☐
interpretation
☐
reporting
Relevant for
new buildings

existing buildings

building products

screening LCA

simplified LCA

complete LCA

Provisions
The transportation of construction machinery to the building site is optional, owing to both potentially missing data and minor relevance. It may be included in screening and simplified LCA if it is relevant for the goal and scope of the study (e.g. a construction company might have more interest than a building designer on this aspect). If the transportation of construction machinery is accounted for, rules for its estimation should follow the recommendations of EN 15804. In this case, practitioners should refer to the cut-off rules, and use default values (ratios) for the transportation distances and load factors.

Rules from
EN 15978
  • No specific rule is defined (8.5 Scenarios for the construction process stage (Modules A4–A5))
EN 15804
  • No specific rule is defined (6.3.4.3 Construction stage)

Guidance
The practitioner can use default values (ratios) defined with stakeholders for screening and simplified LCA. This aspect may be neglected for most construction projects, owing to its minor relevance.

A-15 Installation of the product into the building – screening and simplified LCA

Aspect A-15 Installation of the product into the building – screening and simplified LCA

Description
The installation of products into the building needs ancillary materials and processes (e.g. energy). What should be taken into account during the installation stage (e.g. drills, screwdrivers)?
Related
study objective
☒ stand-alone LCA ☒ comparative assertion
Related
study phase
☒
goal and scope definition
☐
inventory analysis (LCI)
☐
impact assessment (LCIA)
☐
interpretation
☐
reporting
Relevant for
new buildings

existing buildings

building products

screening LCA

simplified LCA

complete LCA

Provisions
The inclusion of ancillary materials should follow EN 15804/EN 15978. This information should be available in construction product datasets or EPD data that are compliant with EN 15804. The energy and related emissions from the construction tools and installation materials should follow EN 15978. They may be omitted for screening and simplified LCA studies, owing to their minor relevance.

Rules from
EN 15978
  • 8.5 Scenarios for the construction process stage (Modules A4–A5)
EN 15804
  • 6.2.3. A4–A5, Construction process stage, information modules
  • 7.3.2. Construction process stage

Guidance
General guidance for product LCA studies (e.g. EPD)
According to both EN 15804 and EN 15978, the installation of products into the building, including ancillary materials and their related processes, should be taken into account. The practitioner should comply with EN 15804 as far as possible, assuming the provisions are sufficiently clear. If an aspect is not clearly defined in the standard (e.g. there is so far no list of ancillary materials for the different applications of building products), the practitioner should always document assumptions made concerning the inclusion of ancillary materials.

Specific guidance for product LCA studies (e.g. EPD)
For cradle-to-grave product LCA, the practitioner needs to combine a cradle-to-gate LCA with some LCA data for ancillary materials implemented in the construction stage in order to fulfil the functional unit. For example, for cradle-to-grave EPD of a glued laminated timber beam in a building, the functional unit can be as follows: the function ‘support the structural elements from the roof for 100 years’ is defined for 1 ml of a beam of 5 m for a cross-section of 0.3 × 0.1 m. The ancillary materials in this case might be galvanized steel bolts, for example. The impacts related to their manufacture and transport to the site should be allocated to Module A5, as they are not primary raw materials in the wooden beam manufacturing process.

However, in other cases, e.g. ready-mixed concrete assembled on site with reinforcing steel, as these two raw materials are not ancillary materials the impacts of their manufacture and transport to the site should be allocated to Modules A3 and A4 respectively.

For other specific cases it may be tricky. For example, for ceramic tiles that need on-site mortar to be installed in the building, the allocation of the impacts of the mortar may be not clear, as it depends on the status of the mortar: is it a raw material next to the ceramic tiles (impact allocated to Modules A1–A3) or only an ancillary product (impact allocated only to Module A5)?

The more the environmental impacts of ancillary materials (related to manufacturing and transport to the site) are allocated to Module A5, the more relative impact this life cycle stage will have compared with production and end-of-life. It should be emphasized that the ancillary materials’ upstream impacts are not direct impact of a construction site.

In this context, the results for Module A5 should be interpreted accordingly.

Specific guidance for building LCA studies
If relevant for the goal of the study, use ratios (generic data) for screening and simplified LCA, though the ancillary materials may be omitted, because of their minor relevance.

A-17 Accounting of on-site capital goods (e.g. construction ma-chinery, bungalows…)

Aspect A-17 Accounting of on-site capital goods (e.g. construction machinery, bungalows…)

Description
Various capital goods can be found on a construction site, such as construction machinery (skid-steer loaders, bulldozers), cranes, and the bungalows for the workers. These capital goods are generally used by a construction company on different construction projects. In this context, it is important to assess the depreciation of capital goods, and allocate the impacts of their manufacture to a certain amount for one construction site. Should capital goods be included in complete LCA studies? Is there necessarily a deviation from EN 15978?
Related
study objective
☒ stand-alone LCA ☒ comparative assertion
Related
study phase
☒
goal and scope definition
☐
inventory analysis (LCI)
☐
impact assessment (LCIA)
☐
interpretation
☐
reporting
Relevant for
new buildings

existing buildings

building products

screening LCA

simplified LCA

complete LCA

Provisions
The capital goods may be included in complete LCA if they are relevant for the goal and scope of the study (e.g. a construction company might have more interest than a building designer in this aspect). The capital goods may be taken into account in screening and simplified LCA using default values, or they may be optional, owing to the lack of data.

Rules from
EN 15978
  • 7.4.3.3 Boundary of the on-site processes (Module A5)
  • 9.4.3 Criteria for the exclusion of inputs and outputs

Guidance
The practitioner should use detailed calculation based on specific data for complete LCA, and refer to the cut-off rules guidance, if relevant. The capital goods may be assessed in screening and simplified LCA by using default values. LCA data can be calculated using LCA data for building products (as a proxy) if no more precise data are available on complete capital goods (e.g. a crane is composed of x% of steel, y%…, etc.). This aspect may be neglected for most construction projects, owing to its minor relevance.

A-18 Water and energy demand – screening and simplified LCA

Aspect A-18 Water and energy demand – screening and simplified LCA

Description
This aspect concerns the water and energy demand on the construction site. Energy and water are consumed both for the construction of the building and for the workers’ accommodation.
Related
study objective
☒ stand-alone LCA ☒ comparative assertion
Related
study phase
☒
goal and scope definition
☐
inventory analysis (LCI)
☐
impact assessment (LCIA)
☐
interpretation
☐
reporting
Relevant for
new buildings

existing buildings

building products

screening LCA

simplified LCA

complete LCA

Provisions
Water and energy consumption on the construction site should be considered in accordance with the corresponding study type. It may be included in the context of a screening or simplified LCA.

Rules from
EN 15978
  • 8.5 Scenarios for the construction process stage (Modules A4–A5)

Guidance
The practitioner should use default values (ratios) for screening and simplified LCA. Such data can be defined with stakeholders. Practitioners should refer to the guidance on cut-off rules, if relevant.

A-20 Construction wastes – screening and simplified LCA

Aspect A-20 Construction wastes – screening and simplified LCA

Description
The construction of a building generates considerable cutting waste. Should such waste be considered in the context of a screening or simplified LCA?
Related
study objective
☒ stand-alone LCA ☒ comparative assertion
Related
study phase
☒
goal and scope definition
☐
inventory analysis (LCI)
☐
impact assessment (LCIA)
☐
interpretation
☐
reporting
Relevant for
new buildings

existing buildings

building products

screening LCA

simplified LCA

complete LCA

Provisions
Construction waste may be included in a screening or simplified LCA if it is relevant for the goal and scope of the study (e.g. a construction company might have more interest than a building designer in this aspect).

Rules from
EN 15978
  • 8.5 Scenarios for the construction process stage (Modules A4–A5)
EN 15804
  • 6.2.3 A4–A5, Construction process stage, information modules

Guidance
In some EPDs, waste during installation into the building may be documented. The practitioner should use default values (e.g. ratios) for screening and simplified LCA. This information might be a default loss of product on site per type of product, or else the practitioner might use a global average, e.g. 5%, to see whether this aspect is significant in the final LCA results. If a construction waste is included, the impact of production related to the loss of product should be quantified within Module A5. WRAP has consulted with UK industry and has provided baseline and good practice wastage rates for most construction material types, which could be used in the absence of other data.