Skip to main content

A-23 Prefabrication of building products – complete LCA

Aspect A-23 Prefabrication of building products – complete LCA

Description
This aspect refers to the off-site construction assembly of prefabricated product such as reinforced concrete. Should the off-site construction be included in the context of a complete LCA?
Related
study objective
☒ stand-alone LCA ☒ comparative assertion
Related
study phase
☒
goal and scope definition
☐
inventory analysis (LCI)
☐
impact assessment (LCIA)
☐
interpretation
☐
reporting
Relevant for
new buildings

existing buildings

building products

screening LCA

simplified LCA

complete LCA

Provisions
Preprocessing should be considered in the context of a complete LCA. The manufacture of prefabricated building products should be included in Modules A1–A3, and their transport in Module A4. The impacts related to their installation (waste, machinery etc.) should be included in Module A5.

Rules from
EN 15978
  • 8.5 Scenarios for the construction process stage (Modules A4–A5)

Guidance
The practitioner should use detailed calculation for a complete LCA, based on specific data (e.g. EPD information for Module A5).

Lifecycle stage: A (all modules), Lifecycle stage: A5, Related study objective: comparative assertion, Related study objective: stand-alone LCA, Related study phase: Goal and scope definition, Study type: Complete LCA