B-10 Assessment of different repair and maintenance alternatives
| Aspect | B-10 Assessment of different repair and maintenance alternatives | |||||||||
|
Description |
The performance of a product often depends on maintenance. However, several maintenance schemes may be developed for the same product, depending on the owner’s requirements and the building specifics. In the case of the repair module, several repair alternatives may also be considered, notably for an existing building. | |||||||||
|
Related study objective |
☒ stand-alone LCA | ☒ comparative assertion | ||||||||
|
Related study phase |
☒ goal and scope definition |
☐ inventory analysis (LCI) |
☐ impact assessment (LCIA) |
☐ interpretation |
☐ reporting |
|||||
| Relevant for |
new buildings |
existing buildings |
construction products |
screening LCA |
simplified LCA |
complete LCA |
||||
|
Provisions |
When considering and comparing several repair or maintenance scenarios, the following items should be taken into account and documented:
The consequences of the repair scenario should be studied (the influence on future maintenance and replacement scenarios, and the impacts on building performance). |
|||||||||
|
Rules from |
|
|||||||||
|
Guidance |
The overall repair scenario should be consistent with respect to the building structure (e.g. replacement of coating is mandatory if repairing the support).
The boundaries of the repair and maintenance modules should be similar in the case of comparison (refer to ‘Repair with complete LCA’ for further guidance). It is recommended that sensitivity analysis be used when comparing different scenarios. |
|||||||||
Lifecycle stage: B (all modules), Lifecycle stage: B3, Related study objective: comparative assertion, Related study objective: stand-alone LCA, Related study phase: Goal and scope definition, Study type: Complete LCA, Study type: Screening LCA, Study type: Simplified LCA